A contractor can skip the percentage-of-completion method for a construction contract if the contract is a residential construction contract, or if the contractor expects to finish it within two years and passes the §448(c) gross receipts test, which is $32,000,000 for taxable years beginning in 2026. Those are the two exemptions in IRC §460(e)(1), usually called the small contractor exception.
The exception matters because percentage-of-completion taxes profit as costs are incurred, before a job is finished and sometimes before it is fully paid. Exempt contracts can use the completed-contract method or another permissible method, avoid look-back interest, and in many cases defer income until the job is done.
Key takeaways
- You can skip percentage-of-completion on a construction contract that is residential, or that you expect to finish within two years if your average annual gross receipts for the prior three years are $32,000,000 or less (taxable years beginning in 2026).
- The 2025 law (Pub. L. 119-21) widened the first exemption from home construction contracts to all residential construction contracts, for contracts entered into in taxable years beginning after July 4, 2025.
- Both tests are applied when the contract is entered into, using your estimate of completion time at that point.
- Exempt contracts may use the completed-contract method, the exempt-contract percentage-of-completion method, or another permissible method, and they are outside the look-back interest rules.
- Switching an exempt contract off percentage-of-completion is an automatic method change (designated change number 236 under Rev. Proc. 2025-23), made on a cut-off basis with no §481(a) adjustment.
On this page: What is the default rule for long-term construction contracts?Which residential contracts are exempt from percentage-of-completion?How does the small contractor exception work for other construction contracts?Which accounting methods can an exempt contract use?Does look-back interest apply to exempt contracts?How does a contractor switch off percentage-of-completion?What should a contractor do before relying on the exception?
What is the default rule for long-term construction contracts?
The default is the percentage-of-completion method (PCM): under IRC §460(a), taxable income from a long-term contract is determined by percentage of completion. A long-term contract is a contract for building, installation or construction that is not completed within the taxable year it is entered into (IRC §460(f)). A job signed in October and finished the following March is a long-term contract; a job signed and finished in the same tax year is not.
Under PCM, the share of the contract price you report each year follows the share of estimated total costs you have incurred. If you have spent 40% of the estimated costs by December 31, you report roughly 40% of the contract price as revenue for that year, whether or not you have billed or collected it. When the contract is finished, the look-back method under §460(b) compares the income you reported with the income that actual costs would have produced, and interest is paid or received on the difference.
Which residential contracts are exempt from percentage-of-completion?
Under IRC §460(e)(1)(A), any residential construction contract is exempt, whatever the contractor’s size, for contracts entered into in taxable years beginning after July 4, 2025. A residential construction contract is one where 80% or more of the estimated total contract costs are reasonably expected to be attributable to dwelling units and to improvements directly related to those units on the same site (§460(e)(4)(B)).
Before the 2025 law, only home construction contracts were fully exempt. A home construction contract meets the same 80% test, but only for buildings containing four or fewer dwelling units (§460(e)(4)(A)). Residential contracts for larger buildings fell under a modified percentage-of-completion rule that Pub. L. 119-21 struck from the Code. For a calendar-year builder, contracts signed in 2026 and later are generally under the broader rule; contracts signed earlier keep the treatment they started with.
One condition still follows larger builders. If a residential contract does not meet the two small contractor tests below, §263A cost capitalization applies. For that purpose, a residential contract that is not a home construction contract may use a three-year completion window instead of two.
How does the small contractor exception work for other construction contracts?
Any other construction contract is exempt under §460(e)(1)(B) if, when the contract is entered into, the contractor meets two tests:
- Two-year estimate. The contractor estimates, at signing, that the contract will be completed within two years of the contract commencement date.
- Gross receipts. The contractor meets the §448(c) gross receipts test for the taxable year the contract is entered into. For taxable years beginning in 2026, that means average annual gross receipts of $32,000,000 or less for the three preceding taxable years (Rev. Proc. 2025-32, §4.30).
A construction contract for this purpose covers building, construction, reconstruction or rehabilitation of real property, installation of an integral component of real property, and improvements to real property (§460(e)(3)). Tax shelters that are barred from the cash method under §448(a)(3) cannot use the exception.
Two details trip contractors up. First, related businesses under common control are combined for the gross receipts test (§448(c)(2)), so a contractor who splits work across several entities may not be as small as each return suggests. Second, a sole proprietor applies the test as if each trade or business were a corporation or partnership (§460(e)(2)(A)).
Illustrative: A commercial contractor organized as an S corporation averaged $14 million in gross receipts for 2023 through 2025. In March 2026 it signs a $1.8 million tenant build-out it expects to finish in 15 months. Both tests are met, so the contract is exempt. If the same company had averaged $36 million, or expected the job to take 30 months, the contract would be on percentage-of-completion.
Which accounting methods can an exempt contract use?
Treas. Reg. §1.460-4(c)(1) lists the permissible exempt contract methods as the percentage-of-completion method, the exempt-contract percentage-of-completion method (EPCM), the completed-contract method (CCM), or any other permissible method. The regulation describes the exempt contract method as one the contractor uses for all of its exempt long-term contracts, so the choice is made once, not job by job.
- Completed-contract method. The gross contract price and all allocable contract costs are reported in the year the contract is completed (§1.460-4(d)). This gives the most deferral on profitable jobs that cross year-end.
- EPCM. Income is still reported as the job progresses, much like PCM, but because the contract is exempt, look-back interest does not apply.
- Other permissible methods. A contractor that is otherwise allowed to use the cash method, which a corporation or partnership meeting the §448(c) test generally is under §448(b)(3), may be able to account for exempt contracts on that method.
The best choice depends on profit margins, how jobs straddle year-end, billing patterns, and what lenders and sureties expect to see in financial statements, which can differ from the tax method. We model those trade-offs as part of tax planning for contractors.
Does look-back interest apply to exempt contracts?
No. Section 460(e)(1) states that subsections (a), (b), and (c)(1) and (2) do not apply to exempt contracts, and the look-back method sits in subsection (b). An exempt contract therefore has no look-back calculation even if you happen to account for it on a percentage-of-completion style method.
Contracts that remain on PCM have their own narrow relief. Under §460(b)(3)(B), look-back does not apply to a contract completed within two years whose gross price does not exceed the lesser of $1,000,000 or 1% of the taxpayer’s average annual gross receipts for the three years before completion.
How does a contractor switch off percentage-of-completion?
A contractor that becomes eligible changes methods by filing Form 3115. Section 19.01 of Rev. Proc. 2025-23 treats a change for exempt contracts described in §460(e)(1)(B), from PCM to an exempt contract method, as an automatic change with designated change number 236 and a reduced Form 3115 filing requirement. The same section covers a contractor that stops capitalizing §263A costs on home construction contracts.
The change is made on a cut-off basis: it applies only to contracts entered into on or after the first day of the year of change, and no §481(a) adjustment is permitted or required. Contracts already underway finish on the old method. That is why timing matters; a contractor that crosses back under the gross receipts threshold should decide before signing the next year’s contracts. The change is reported with the business tax return for the year of change.
Rev. Proc. 2025-23 predates the 2025 residential change, so a builder moving residential contracts off PCM under the broader rule should confirm the current procedure before filing.
What should a contractor do before relying on the exception?
Start with three records: a three-year gross receipts calculation that includes every related entity, a written completion estimate for each contract at signing, and a contract-by-contract list tagging each job as residential, home, or other. Those records are what an examiner asks for first.
Then match the method to the books. Job costing has to be clean enough to tell when a contract is complete and which costs belong to it. Our page for contractors and construction companies covers job costing, equipment depreciation and multi-state work, and our guide to Section 179 vs bonus depreciation for construction equipment covers the other large year-end decision.
Frequently asked questions
What is the gross receipts limit for the small contractor exception in 2026?
For taxable years beginning in 2026, a contractor meets the Section 448(c) gross receipts test if its average annual gross receipts for the three preceding taxable years do not exceed $32,000,000. Related businesses under common control are combined.
Can a large homebuilder use the completed-contract method?
Yes, for residential construction contracts entered into in taxable years beginning after July 4, 2025, because those contracts are exempt from percentage-of-completion regardless of size. A builder that fails the small contractor tests must still capitalize costs under Section 263A.
What if a job I expected to finish in 18 months takes 30?
The statute tests the completion estimate made at the time the contract is entered into, not the actual completion date. That is why the estimate, and the basis for it, should be documented when the contract is signed.
Do I need IRS permission to stop using percentage-of-completion?
A qualifying change for exempt contracts is an automatic change under Rev. Proc. 2025-23, designated change number 236, filed on Form 3115. It applies on a cut-off basis to contracts entered into on or after the first day of the year of change.
Does the exception apply to manufacturing contracts?
No. Section 460(e) applies to construction contracts for real property. Long-term manufacturing contracts follow separate rules.
General information, not tax advice.